THE INDEX
Why this MSI reads 67
5 of 18 checked public signals observed, covering 100% of the model. The score is public; the signal-by-signal reasons, source documents, and owner details are in LienSuite.
THE RECORD
Property details
- Property type
- Rowhouse (DHCD use 1008)
- Owner of record
- Carter, Lafern G (Life) (mailing address 0817 Showell Ct, 21202)
- Homestead / principal residence
- Owner-occupied principal residence (Permanent Home indicator H)
- Vacant building notice
- None open
- Structure area
- 1,152 sq ft
- Last recorded transfer
- Consideration not stated, private non-arms-length transfer such as a foreclosure, gift or auction, September 24, 2024
- Permits
- 4 DHCD permits in the last 12 months: • demolition and disposal to include the following for structural revi (October 6, 2025); • structural scope floor framing repairs replace the rim joist and fir (February 10, 2026); loan/grant - install a new storm door – exterior. install a high quali (February 4, 2026); …
Parcel reference: 1156 022. Facts reflect the listed observation dates and may have changed since then.
OWNERSHIP AND TAXES
Research snapshot
Source details not yet connected. A tax balance is not proof that a property is for sale.
CHANGES OVER TIME
Property timeline
- Permit
• Structural Scope Floor Framing Repairs Replace the rim joist and first-floor joist (only those showing water damage) between the steel beam bearing location and the north foundation wall. Install new 2×8 joists in kind. Replace sill plate at repair area with new PT 2×6 anchored with ½" bolts at 48" o.c. (7" embedment, set in epoxy). Replace subfloor with new ¾" plywood sheathing. Basement Beam Reinforcement Sister one new 2×12 to the existing wood beam with ½" through-bolts at 8" o.c., staggered. Existing steel lally column may remain. Joist Overlap & Fastening Verify all floor-joist overlaps are secured with a minimum of (3) 10d nails at each overlap. Basement Stair & Landing Reconstruction Install a new steel column beneath the basement stair landing to correct sagging and provide proper support. Ensure landing and stair connection is level and structurally sound. Carpentry & Kitchen Scope Repair split drywall in rear right bedroom and finish ready for paint. Refinish or replace master bedroom ceiling as needed (to address existing deterioration). o Repair finish flooring in second-floor hallway and bedroom where missing or damaged. o Install new handrail at basement stairs. o Install second handrail at main staircase to second floor (approximately 123" plus turn). o Tighten and secure existing basement stair handrail. o Replace kitchen cabinets, countertop,(replace with like items in type/quality). o Replace kitchen appliances: ? Microwave ? Refrigerator • Exterior & Site Work o Remove trees growing at the foundation on the side of the house (tree removal only; no trimming-only scope). o Replace rake boards at roof line and wrap with aluminum flashing. o Remove and replace vinyl siding at front and side with like material. o Provide an allowance for replacement of water-damaged sheathing discovered during siding removal and repair. o Replace basement window at side wall with a new unit of similar size and style. as per code as per plans.
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Permit
Loan/Grant - INSTALL A NEW STORM DOOR – Exterior. Install a high quality cross buck storm door with a white baked on enamel finish. Stormdoor to have Z-bar frame, 1" or thicker door, removable tempered glass panel, fiberglass screen, locking latch set, automatic closer, wind chain and door sweep. INSTALL A NEW SHOWER STALL - FIBERGLASS, W/FIXTURES - Remove existing shower stall, if any, and provide and install per manufacturer's instructions a new 32" x 60" white. Install any necessary water lines, drain lines, vents, framing, blocking, shims and nailers to ensure proper and code approved installation of shower unit. Fix/replace bathroom sink. Repair and replace back deck with composite flooring. Install new iron railings - new premium grade ornamental iron railings around open edges of floors and stairs. Top rail to be heavy duty, curved and at least 1-5/8" wide. Bottom rail to be heavy duty. TRIM TREE OVERHANGING the back patio - Trim tree limbs overhanging roof so that a vertical clearance of about 15 feet exists between the patio steps and any remaining tree limbs..
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Permit
• Demolition and disposal to include the following for structural review: o Existing bathroom walls, ceiling, and fixtures (tub, sink, toilet) o Mechanical closet walls and ceiling o Existing ceiling grid, ceiling at front of basement, paneling to expose existing beam, and paneling to expose water leak.
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Recorded transfer
Consideration not stated, private non-arms-length transfer such as a foreclosure, gift or auction.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026
NEARBY
More records nearby
Other homes on Showell Ct
Highest sell signal in 21202
- Nearby on this streetOwners and records on Showell Ct, 21202
- More in 21202Property records across the ZIP, highest sell signal first
- All of BaltimoreEvery ZIP code with public records on Motsele
Facts on this page reflect their observation dates. Confirm the parcel and current records with the county before acting.