THE INDEX
Why this MSI reads 100
8 of 18 checked public signals observed, covering 100% of the model. The score is public; the signal-by-signal reasons, source documents, and owner details are in LienSuite.
THE RECORD
Property details
- Property type
- Rowhouse (DHCD use 1008)
- Owner of record
- Lsn Investments LLC (mailing address 5304 Moray Ct Waldorf, MD, 20603)
- Homestead / principal residence
- Not the owner’s principal residence per the City record
- Vacant building notice
- None open
- Last recorded transfer
- $22,000, private arms-length transfer, improved, May 14, 2026; 3 transfers on the SDAT record
- Permits
- 3 DHCD permits in the last 12 months: renovation of existing three-story single-family rowhouse for 4 bed/4. (June 4, 2026); installation of new ductwork , new 3.5 ton heat pump system , 4 exhaus (July 6, 2026); install 23 circuits and 200 amp servcie to code plumbing - install, re (July 11, 2026)
- 311 requests
- 1 in the last 12 months at this address: sanitation property (1)
Parcel reference: 0008 015. Facts reflect the listed observation dates and may have changed since then.
OWNERSHIP AND TAXES
Research snapshot
Source details not yet connected. A tax balance is not proof that a property is for sale.
CHANGES OVER TIME
Property timeline
- Permit
INSTALL 23 CIRCUITS AND 200 AMP SERVCIE TO CODE Plumbing - Install, Replace, Reconstruct Fixtures 14 Plumbing - New or Replacement Electric Water Heater 1 Plumbing - Sanitary Sewer Connection 1 Plumbing - Reconstruct Service Lines OnPremises.
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Permit
Installation of new ductwork , new 3.5 ton heat pump system , 4 exhaust fans and 1 dryer exhaust vent REYESHVAC.
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Permit
Renovation of Existing Three-Story Single-Family Rowhouse For 4 Bed/4.5 Bath No change in occupancy. No underpinning proposed. Majority of existing structural framing to remain unless specifically noted below. Separate trade permits (Electrical, Mechanical, and Plumbing) will be pulled by licensed trade contractors. INTERIOR ALTERATIONS 1. Demolition • Category II interior demolition. • No demolition of existing structural bearing walls unless specifically noted. 2. Structural Floor Framing • Remove and replace deteriorated floor joists as required. • Install new 2” x 8” wood floor joists @ 16” O.C., bearing in existing masonry joist pockets. • Provide proper end bearing per IRC requirements. • Install approved Simpson Strong-Tie connectors at joist-to-wall and joist-to-framing connections where applicable. • Install new ¾” OSB subfloor, screwed to new joists. 3. Basement Work (No Underpinning) • Install interior drain tile system inside basement perimeter walls. • Basement shall be finished for storage only. 4. Stairs • New code-compliant stairs proposed all floors. • Install new code-compliant handrails and guardrails as required. 5. Interior Framing • Frame approximately 400 SF of new interior partition walls using 2” x 4” wood studs @ 16” O.C. • Provide required blocking for casework, vanities, shelving, and fixtures. 6. Insulation • Install R-38 batt insulation at roof/ceiling level. • Install R-21 batt insulation in new exterior framed walls. • Install R-15 batt insulation at furred masonry front wall. 7. Gypsum Board & Wall Assemblies Where required we will install as follows: • Standard interior walls and ceiling infill: ½” gypsum wallboard (GWB). • Bathroom and kitchen wet walls: ½” moisture-resistant GWB. • Tile and backsplash areas: ½” cement board (Durock). • Install vapor barrier at insulated bearing wall assemblies where required by code. • Fire-caulk all required rated penetrations. ? EXTERIOR ALTERATIONS 1. Exterior Wall Framing (Where Applicable) • Any new exterior framed walls shall use 2” x 6” wood studs @ 16” O.C. • Any repaired exterior walls shall Install ½” exterior-grade plywood sheathing and weather-resistive barrier (Tyvek or approved equal). • We’re applicable exterior finish where repaired: vinyl siding 2. Roof Replacement • Remove existing roofing materials down to deck. • Demolish and replace any damaged roof joists • Where required to repair/replace damage joists o Install new 2” x 8” roof joists @ 16” O.C. ? Roof joists to bear in existing masonry pockets and/or approved bearing assemblies. ? Provide required lateral bracing and ties per IRC. • Replace roof decking as required with ½” plywood sheathing, fastened per code. • Install new 2-ply torch-down modified bitumen roofing system. 3. Gutters • Install 5” aluminum K-style gutters with 3” x 4” downspouts discharging to on-grade splash blocks. 4. Windows • Remove and replace fourteen (14) vinyl windows, same size and same location. • Installation to comply with current IRC egress and flashing requirements. 5. Exterior Doors • Install two (2) new pre-hung insulated exterior doors, installed per manufacturer specifications and code. all work will be done according to Baltimore city code and per submitted plans. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance..
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - Recorded transfer
$22,000, private arms-length transfer, improved.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026 - Recorded transfer
$11,011, private non-arms-length transfer such as a foreclosure, gift or auction.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026 - Recorded transfer
$11,550, private arms-length transfer, improved.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026
NEARBY
More records nearby
Other homes on N Fulton Ave
Highest sell signal in 21217
- Nearby on this streetOwners and records on N Fulton Ave, 21217
- More in 21217Property records across the ZIP, highest sell signal first
- All of BaltimoreEvery ZIP code with public records on Motsele
Facts on this page reflect their observation dates. Confirm the parcel and current records with the county before acting.