THE INDEX
Why this MSI reads 100
9 of 18 checked public signals observed, covering 100% of the model. The score is public; the signal-by-signal reasons, source documents, and owner details are in LienSuite.
THE RECORD
Property details
- Property type
- Rowhouse (DHCD use 1008)
- Owner of record
- Hope Blueprint Development and Corporation (mailing address 4306 High Holly Ct Upper Marlboro, MD, 20772)
- Homestead / principal residence
- Not the owner’s principal residence per the City record
- Vacant building notice
- Open DHCD vacant building notice since February 24, 2026
- Last recorded transfer
- $3,000, private non-arms-length transfer such as a foreclosure, gift or auction, December 16, 2025; 2 transfers on the SDAT record
- Permits
- 1 DHCD permit in the last 12 months: renovation of existing three-story single-family rowhouse with existin (August 12, 2026)
- 311 requests
- 1 in the last 12 months at this address: vacant building (1)
Parcel reference: 0055C007. Facts reflect the listed observation dates and may have changed since then.
OWNERSHIP AND TAXES
Research snapshot
Source details not yet connected. A tax balance is not proof that a property is for sale.
CHANGES OVER TIME
Property timeline
- Permit
Renovation of Existing Three-Story Single-Family Rowhouse with Existing 7’-0” Basement (No Underpinning Required). No change in occupancy. No underpinning proposed. Majority of existing structural framing to remain unless specifically noted below. Separate trade permits (Electrical, Mechanical, and Plumbing) will be pulled by licensed trade contractors. INTERIOR ALTERATIONS 1. Demolition Category II interior demolition. No demolition of existing structural bearing walls unless specifically noted. 2. Structural Floor Framing Remove and replace deteriorated floor joists as required. Install new 2” x 8” wood floor joists @ 16” O.C., bearing in existing masonry joist pockets. Provide proper end bearing per IRC requirements. Install approved Simpson Strong-Tie connectors at joist-to-wall and joist-to-framing connections where applicable. Install new ¾” OSB subfloor, screwed to new joists. 3. Basement Work (No Underpinning) Install interior drain tile system inside basement perimeter walls. Existing 7’-0” basement height to remain; no underpinning proposed. 4. Stairs New code-compliant stairs proposed all floors. Install new code-compliant handrails and guardrails as required. 5. Interior Framing Frame approximately 400 SF of new interior partition walls using 2” x 4” wood studs @ 16” O.C. Provide required blocking for casework, vanities, shelving, and fixtures. 6. Insulation Install R-38 batt insulation at roof/ceiling level. Install R-21 batt insulation in new exterior framed walls. Install R-15 batt insulation at furred masonry front wall. 7. Gypsum Board & Wall Assemblies Majority of existing drywall to remain however where required we will install as follows: Standard interior walls and ceiling infill: ½” gypsum wallboard (GWB). Bathroom and kitchen wet walls: ½” moisture-resistant GWB. Tile and backsplash areas: ½” cement board (Durock). Install vapor barrier at insulated bearing wall assemblies where required by code. Fire-caulk all required rated penetrations. ? EXTERIOR ALTERATIONS 1. Exterior Wall Framing (Where Applicable) Any new exterior framed walls shall use 2” x 6” wood studs @ 16” O.C. Any repaired exterior walls shall Install ½” exterior-grade plywood sheathing and weather-resistive barrier (Tyvek or approved equal). We’re applicable exterior finish where repaired: vinyl siding 2. Roof Replacement Remove existing roofing materials down to deck. Demolish and replace any damaged roof joists Where required to repair/replace damage joists o Install new 2” x 8” roof joists @ 16” O.C. ? Roof joists to bear in existing masonry pockets and/or approved bearing assemblies. ? Provide required lateral bracing and ties per IRC. Replace roof decking as required with ½” plywood sheathing, fastened per code. Install new 2-ply torch-down modified bitumen roofing system. 3. Gutters Install 5” aluminum K-style gutters with 3” x 4” downspouts discharging to on-grade splash blocks. 4. Windows Remove and replace twelve (12) vinyl windows, same size and same location. Installation to comply with current IRC egress and flashing requirements. 5. Exterior Doors Install two (2) new pre-hung insulated exterior doors, installed per manufacturer specifications and code..
DHCD housing and building permits (Open Baltimore) · checked Sep 20, 2026 - 311: Vacant Building
Status Closed.
Baltimore 311 customer service requests (Open Baltimore) · checked Sep 20, 2026 - Vacant building notice
DHCD notice 2618079A, still open.
DHCD vacant building notices (Open Baltimore) · checked Sep 20, 2026 - Recorded transfer
$3,000, private non-arms-length transfer such as a foreclosure, gift or auction.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026 - Recorded transfer
Consideration not stated, private non-arms-length transfer such as a foreclosure, gift or auction.
Maryland SDAT Baltimore City real property assessments (opendata.maryland.gov) · checked Sep 20, 2026
NEARBY
More records nearby
Other homes on N Carey St
Highest sell signal in 21217
- Nearby on this streetOwners and records on N Carey St, 21217
- More in 21217Property records across the ZIP, highest sell signal first
- All of BaltimoreEvery ZIP code with public records on Motsele
Facts on this page reflect their observation dates. Confirm the parcel and current records with the county before acting.